Resume

Education

Graduated with a Bachelor of Science in Business Administration with specialization in Management Information Systems and a minor in Computer Science from Bowling Green State University in December 2010.

Course concentration in Supply Chain, ERP/MRP Systems, Database Management, Network Administration, Web Design/Development.

Experience

Senior Buyer / Planner || Nelson Stud Welding (Stanley Black & Decker)

November 2020 to present

  • Release stock raw material from suppliers and coordinate deliveries for 15-20 truckloads per week to ensure availability while also utilizing just-in-time delivery practices with safety stock to minimize on hand inventory.
  • Level load demand across 20+ cold headers and bolt makers based on available capacity, manning, and machine capabilities.
  • Optimize setup efficiency by grouping similar parts based on material, draw size, length, and part type. Numerous grades of material, diameter ranges from less than 1/4″ to over 1″, and lengths from less than 1″ to over 12″.
  • Work closely with leadmen and operators to find additional schedule efficiency adjustments while maintaining a balance between setup minimization and customer on time delivery.
  • Communicate with sales personal at warehouses nationwide to ensure safety stock levels are kept for short lead time orders.
  • Responsible for the production and shipment of approximately 5 million fasteners per week.
  • Train and supervise the Buyer/Planner who took over the responsibilities listed in the position below.

Buyer / Planner || Nelson Stud Welding (Stanley Black & Decker)

April 2020 to October 2020

  • Manage CAT product line.
    • Review weekly release and forecast changes and accommodate where available by adjusting production schedules.
    • Purchase discrete raw materials and schedule work across 6 cold headers and bolt makers.
    • Work with subcontract suppliers to ensure quick turn around to meet customer delivery dates.
  • Manage ferrule department.
    • Purchase and schedule the mix of ingredients to create raw material clay.
    • Schedule various sizes across 15 presses by level loading demand to optimize efficiency while meeting customer due dates.
    • Coordinate kiln processing and packing for approximately 5 million ferrules per week.

Operations Manager || PR Machine Works & Slick Automated Solutions

May 2019 to April 2020

  • Manage day-to-day operations supervising direct and indirect reports in the areas of supply chain, procurement, distribution, and inventory.
  • Directed ERP reimplementation to accomplish:
    • Standardized part methods through contract review and job review
    • Raw material smart part numbers based on grade, type, and size
    • Utilization of system generated reports for raw material procurement and stock replenishment
    • Realigned min/max inventory levels with historic usage and forecasts
    • Utilization of system generated sales order pick lists, packing slips, and bills of lading

Master Planner Scheduler || Chandler Products

June 2014 to May 2019

  • Create and monitor weekly master schedule for all departments in the shop as well as off-site subcontract operations.
  • Coordinate with department lead men to group shop orders efficiently to minimize change overs while still meeting customer deliveries.
  • Utilize level and balanced scheduling practices by reallocating resources to address bottlenecks and capacity constraints.
  • Set safety stock levels using historical data and forecasts to minimize finished goods inventory while maintaining a high level of service to customers.
  • Report KPIs to upper management including on time delivery, finished goods inventory levels, and production efficiencies.
  • Audit and correct discrepancies in operator labor reporting including setup and run times, piece counts, piece weights, and material issuance.
  • Review and explain manufacturing variances including scrap and labor inefficiencies and suggest corrective actions geared toward minimizing future variances.
  • Continue to fulfill previous Buyer / Planner responsibilities.

Buyer / Planner || Chandler Products

June 2012 to June 2014

  • Review PO suggestions to determine raw material requirements and issue RFQs to approved raw material suppliers.
  • Create and issue purchase orders ensuring all customer requirements are met including DFARS, domestic source, and lead time constraints.
  • Decreased on hand raw material by fifty percent over the course of nine months by repurposing slow moving and obsolete inventory.
  • Continue to fulfill previous Planner responsibilities.

Planner / IT || Chandler Products

June 2011 to June 2012

  • Review and firm MRP suggestions to release work orders to the production floor.
  • Create job traveler packets including job routings, product drawings, and quality check sheets and distribute them to the correct work centers.
  • Setup, configure, and maintain computer workstations, mobile devices, and printers.
  • Troubleshoot day to day IT issues including network connectivity, user permissions, and printers.
  • Perform hardware installations and upgrades including hard drives, memory, network cards, routers, switches, and cable wiring.

Web Design & Development || Freelance

January 2009 to Present

  • Work closely with clients to determine needs and ensure satisfaction from the beginning to end of the project development life cycle.
  • Project scope ranges between designer, developer, webmaster, and site administrator.
  • Using validated HTML5, CSS3, PHP, and WordPress CMS, designed, developed, and maintained numerous sites including but not limited to:
  • Provide training to interested clients on the use of WordPress backend to allow them to easily edit and update their content.

Skills

Proficient with:

  • Microsoft Office Suite, Epicor Vantage ERP, ECi M1, Infor LX (AS400), Adobe DreamWeaver, Google Apps, WordPress, HTML5, CSS3, Windows XP/7/8/10/11, Zoom

Experience with:

  • Linux, Adobe PhotoShop, MySQL, PHP, Javascript, LogMeIn, GoToMeeting, Join.Me