Education
Graduated with a Bachelor of Science in Business Administration with specialization in Management Information Systems and a minor in Computer Science from Bowling Green State University in December 2010.
Course concentration in Supply Chain, ERP/MRP Systems, Database Management, Network Administration, Web Design/Development.
Experience
Senior Buyer / Planner || Nelson Stud Welding (Stanley Black & Decker)
November 2020 to present
- Release stock raw material from suppliers and coordinate deliveries for 15-20 truckloads per week to ensure availability while also utilizing just-in-time delivery practices with safety stock to minimize on hand inventory.
- Level load demand across 20+ cold headers and bolt makers based on available capacity, manning, and machine capabilities.
- Optimize setup efficiency by grouping similar parts based on material, draw size, length, and part type. Numerous grades of material, diameter ranges from less than 1/4″ to over 1″, and lengths from less than 1″ to over 12″.
- Work closely with leadmen and operators to find additional schedule efficiency adjustments while maintaining a balance between setup minimization and customer on time delivery.
- Communicate with sales personal at warehouses nationwide to ensure safety stock levels are kept for short lead time orders.
- Responsible for the production and shipment of approximately 5 million fasteners per week.
- Train and supervise the Buyer/Planner who took over the responsibilities listed in the position below.
Buyer / Planner || Nelson Stud Welding (Stanley Black & Decker)
April 2020 to October 2020
- Manage CAT product line.
- Review weekly release and forecast changes and accommodate where available by adjusting production schedules.
- Purchase discrete raw materials and schedule work across 6 cold headers and bolt makers.
- Work with subcontract suppliers to ensure quick turn around to meet customer delivery dates.
- Manage ferrule department.
- Purchase and schedule the mix of ingredients to create raw material clay.
- Schedule various sizes across 15 presses by level loading demand to optimize efficiency while meeting customer due dates.
- Coordinate kiln processing and packing for approximately 5 million ferrules per week.
Operations Manager || PR Machine Works & Slick Automated Solutions
May 2019 to April 2020
- Manage day-to-day operations supervising direct and indirect reports in the areas of supply chain, procurement, distribution, and inventory.
- Directed ERP reimplementation to accomplish:
- Standardized part methods through contract review and job review
- Raw material smart part numbers based on grade, type, and size
- Utilization of system generated reports for raw material procurement and stock replenishment
- Realigned min/max inventory levels with historic usage and forecasts
- Utilization of system generated sales order pick lists, packing slips, and bills of lading
Master Planner Scheduler || Chandler Products
June 2014 to May 2019
- Create and monitor weekly master schedule for all departments in the shop as well as off-site subcontract operations.
- Coordinate with department lead men to group shop orders efficiently to minimize change overs while still meeting customer deliveries.
- Utilize level and balanced scheduling practices by reallocating resources to address bottlenecks and capacity constraints.
- Set safety stock levels using historical data and forecasts to minimize finished goods inventory while maintaining a high level of service to customers.
- Report KPIs to upper management including on time delivery, finished goods inventory levels, and production efficiencies.
- Audit and correct discrepancies in operator labor reporting including setup and run times, piece counts, piece weights, and material issuance.
- Review and explain manufacturing variances including scrap and labor inefficiencies and suggest corrective actions geared toward minimizing future variances.
- Continue to fulfill previous Buyer / Planner responsibilities.
Buyer / Planner || Chandler Products
June 2012 to June 2014
- Review PO suggestions to determine raw material requirements and issue RFQs to approved raw material suppliers.
- Create and issue purchase orders ensuring all customer requirements are met including DFARS, domestic source, and lead time constraints.
- Decreased on hand raw material by fifty percent over the course of nine months by repurposing slow moving and obsolete inventory.
- Continue to fulfill previous Planner responsibilities.
Planner / IT || Chandler Products
June 2011 to June 2012
- Review and firm MRP suggestions to release work orders to the production floor.
- Create job traveler packets including job routings, product drawings, and quality check sheets and distribute them to the correct work centers.
- Setup, configure, and maintain computer workstations, mobile devices, and printers.
- Troubleshoot day to day IT issues including network connectivity, user permissions, and printers.
- Perform hardware installations and upgrades including hard drives, memory, network cards, routers, switches, and cable wiring.
Web Design & Development || Freelance
January 2009 to Present
- Work closely with clients to determine needs and ensure satisfaction from the beginning to end of the project development life cycle.
- Project scope ranges between designer, developer, webmaster, and site administrator.
- Using validated HTML5, CSS3, PHP, and WordPress CMS, designed, developed, and maintained numerous sites including but not limited to:
- Provide training to interested clients on the use of WordPress backend to allow them to easily edit and update their content.
Skills
Proficient with:
- Microsoft Office Suite, Epicor Vantage ERP, ECi M1, Infor LX (AS400), Adobe DreamWeaver, Google Apps, WordPress, HTML5, CSS3, Windows XP/7/8/10/11, Zoom
Experience with:
- Linux, Adobe PhotoShop, MySQL, PHP, Javascript, LogMeIn, GoToMeeting, Join.Me
References
Available upon request.